Thursday March 30, 2017

Register today

REGIONAL JOURNALISM, GLOBAL PERSPECTIVE.

Business
Shipping

Journey to the top of the Earth

On-time completion of the Yamal LNG project will require that shippers navigate the NSR during the winter. For one company, this has already meant breaking new ground
Business
Red. And black and white all over. (Photo: ZPMC Red Box Energy Services)

Share this article

Facebook Google Twitter Mail

iAbout Press releases

As part of our continuing efforts to bring you as much information about our region as possible we offer readers a press release service that allows private firms, public agencies, non-governmental organisations and other groups to submit relevant press releases on our website.

All press releases in this section are published in their full length and have not been edited.

If you have a press release or other announcement you would like to have published, please send it to arcticjournal-editor@arcticjournal.com.

We reserve the right to reject press releases we deem irrelevant or inappropriate. 

All material submitted to The Arctic Journal, including pictures and videos, will be assumed to be available for publication by The Arctic Journal and its related entities.

A ship owned by ZPMC Red Box Energy Services, a Netherlands-based marine-transport services provider, has become the first cargo vessel to sail heavy construction modules along the Northern Sea Route, a shipping lane north of Russia, during the winter months.

The Audax, which is capable of breaking through second-year ice up to 1.5 metres thick, is reported to have arrived on January 4 in the port of Sabetta, on the Yamal Peninsula, where the components were delivered for use in construction of the Yamal LNG project.

The ship departed Qingdao, China, in November, passing first through the Bering Strait, and then westbound along the NSR, where it was escorted for part of the way by Russian icebreakers.

SEE RELATED: For Asians, Arctic shipping already a “reality”

Aside from a three-month window each summer, Sabetta is only accessible by ice-classed vessels, but the timing of the delivery of the three 6,000-tonne modules was necessary in order for the $27 billion natural-gas liquefaction plant, being built by Novatek, its Russian-majority owner, Total, a French firm, and the China National Petroleum Corporation, a state-owned venture, to be completed in time for production to come on-line as planned later this year.

The Audax, and the Pugnax, an identical sister ship, were purpose-built for Arctic module-transportation and delivered to ZPMC Red Box Energy Services in 2016. Both can operate year-round above the Arctic Circle in temperatures as low as -40°C and are expected to continue serving the Yamal site.

“We invested a lot over the last two years in the training and preparation of our crews for this voyage,” Philip Adkins, the managing director, said in a statement.

SEE RELATED: The NSR of the south

In April, both ships sailed to Sabetta from China, though at that time, they sailed eastward on the NSR, after departing southern China and sailing through the Suez Canal. 

The two ships are scheduled to make further deliveries to the Yamal site this winter, though ZPMC Red Box Energy Services expects the modules will be transferred to the two ships in the port of Zeebrugge, in Belgium*, after arriving from China via the Suez Canal.

All routes lead to Yamal.

*We originally stated incorrectly that Zeebrugge was in the Netherlands. Sorry.